Terrace Road - Road Safety Improvements

Share Terrace Road - Road Safety Improvements on Facebook Share Terrace Road - Road Safety Improvements on Twitter Share Terrace Road - Road Safety Improvements on Linkedin Email Terrace Road - Road Safety Improvements link

The City of Perth is pleased to advise that new road safety improvements are proposed for Terrace Road between Victoria Avenue and Plain Street, Perth.

These measures address ongoing feedback from the community on traffic speeds, poor visibility at intersections and driveways. The City has been successful in accessing a Government Black Spot Program grant to improve the safety of Terrace Road.

Following the initial community consultation completed in 2023, the design of the traffic calming measures have been refined to address the issues highlighted during the consultation process.

Notably, through the engineering design phase of the project it was established that the raised intersection treatments as a traffic calming measure at Hill and Bennett Street would create drainage issues and flooding to adjacent properties. As such, the raised intersections have been replaced by a number of raised plateaus between Victoria Avenue and Plain Street.

Below is a summary of the traffic calming measures that have been proposed for Terrace Road. A copy of the design can be found in the documents tab.

• Installation of raised plateaus between Victoria Avenue and Plain Streets

• A continuous painted median between Victoria Avenue and Plain Street with islands at key locations

• Footpath extensions and extended paving to narrow the road and create new pedestrian crossing points

• Localised removal of parking bays at intersections and driveways for improved sight lines

Please note that some minor adjustments may be made as construction progresses and to incorporate some early feedback around design near Bennett Street.

The City of Perth is pleased to advise that new road safety improvements are proposed for Terrace Road between Victoria Avenue and Plain Street, Perth.

These measures address ongoing feedback from the community on traffic speeds, poor visibility at intersections and driveways. The City has been successful in accessing a Government Black Spot Program grant to improve the safety of Terrace Road.

Following the initial community consultation completed in 2023, the design of the traffic calming measures have been refined to address the issues highlighted during the consultation process.

Notably, through the engineering design phase of the project it was established that the raised intersection treatments as a traffic calming measure at Hill and Bennett Street would create drainage issues and flooding to adjacent properties. As such, the raised intersections have been replaced by a number of raised plateaus between Victoria Avenue and Plain Street.

Below is a summary of the traffic calming measures that have been proposed for Terrace Road. A copy of the design can be found in the documents tab.

• Installation of raised plateaus between Victoria Avenue and Plain Streets

• A continuous painted median between Victoria Avenue and Plain Street with islands at key locations

• Footpath extensions and extended paving to narrow the road and create new pedestrian crossing points

• Localised removal of parking bays at intersections and driveways for improved sight lines

Please note that some minor adjustments may be made as construction progresses and to incorporate some early feedback around design near Bennett Street.

  • Terrace Road Safety Improvements - Schedule of Works

    Share Terrace Road Safety Improvements - Schedule of Works on Facebook Share Terrace Road Safety Improvements - Schedule of Works on Twitter Share Terrace Road Safety Improvements - Schedule of Works on Linkedin Email Terrace Road Safety Improvements - Schedule of Works link

    The City of Perth is pleased to advise that road safety improvement works on Terrace Road, between Victoria Avenue and Plain Street, will be taking place from 14 May 2024 to 16 July 2024.

    These measures address ongoing feedback from the community on traffic speeds, poor visibility at intersections and driveways. The City has been successful in accessing a Government Black Spot Program grant to improve the safety of Terrace Road.

    Works are scheduled to occur during normal hours, from Tuesday, 14 May to Tuesday, 16 July 2024 between 7:00am to 5:00pm (weather permitting).

    Partial lane closures during the day time, including minor footpath closures, will be in place in the following locations:

    • Victoria Avenue to Plain Street, Tuesday 14 May till Tuesday 16 July 2024

Page last updated: 02 May 2024, 04:26 PM